Principal text of letter above:
We wish to inform that, you have supplied 4 Nos. of GMX 848 water conditioner vide DC No. 101, dated 19.06.2006 for taking trail to acertain the performance of the equipment.
The above equipments are installed at the pump discharge side of the water circulation pipe lines being fed for Air compressor Head cooling and after cooler cooling.
In this connection we wish to inform that, after 2 months of installation of the above equipment, the pipe line was inspected and observed that the 70% of the excisting scale formation was removed and flow of water is increaded. The performance is found to be satisfactory.
With Regards, |